SCREEDFLOORING

Screed flooring system

Sand–Cement Screed in Auckland

Traditional sand–cement screed shaped to falls, levels and specified depths.

Illustrative sand–cement screed service scene
Illustrative service image. Final method depends on inspection, measurements and the specified floor system.

Request a floor assessment

Tell us what the floor is doing and what finish you need. We will send one enquiry to our ServiceM8 Inbox and one notification email.

Start with the floor assembly

Sand–Cement Screed is not a one-product answer. The existing substrate, intended covering, loads, moisture condition and junctions determine the method. A useful scope records what is present, what must be removed, the target level or performance, and how completion will be checked.

Sand–Cement Screed technical section diagramASSESS → PREPARE → VERIFYSubstrate and system decisions shown schematicallysurvey datum / moisture map

Decision module

Use case

wet areas, ramps and variable-depth corrections.

Evidence

Record levels, condition, moisture indicators and the intended finish rather than selecting from appearance alone.

Escalate

Movement, contamination, active leaks or uncertain structure need resolution before a finish is concealed.

Working process

  1. Inspect
    Confirm substrate, access, edges, levels and visible failure.
  2. Design the scope
    Match preparation and build-up to the finish manufacturer’s requirements.
  3. Verify
    Record preparation, application conditions and readiness for the next trade.

Limitations and site preparation

Important constraints include mix design, compaction and curing. Clear access and identify services. Product drying times are conditional, not promises: temperature, ventilation, thickness and substrate moisture affect readiness. Hidden defects can change the scope after removal or testing.

Screed Flooring coordinates the floor-build-up decision. Specialist delivery is confirmed after assessment, and the delivery team remains responsible for its own inspection and written scope.

Questions answered

When is sand–cement screed appropriate?

It may suit wet areas, ramps and variable-depth corrections. The correct scope depends on an inspection, measurements and the specified finished floor.

What should be checked before work starts?

Check mix design, compaction and curing, site access, adjoining finishes and the product or system requirements before confirming a method.

Can you confirm a solution from photos alone?

Photos help with triage, but depth, moisture, bond, contamination or movement may require on-site testing before a reliable scope is issued.

Related floor guidance

Call 0800 452 102Free quote